A V&V plan names, before execution begins, exactly which verification and which validation activities are planned against what acceptance criteria, with 100% of the ISO 14971 risk controls traced to a planned verification activity.

This template is the starting structure — download it, fill it against your own safety classification, and put it through your own quality system's review before treating it as approved.

What a V&V plan needs to separate

Per Verification vs. Validation, the two are independently evidenced activities. A V&V plan that lists verification and validation as one combined "testing" section is already the most common way this artifact fails an IEC 62304 review for MedTech software — the template below keeps them apart on purpose.

Engineering reference template only. Not an approved plan, not formal regulatory counsel. Version: 1.0.0. Requires your own quality system's review and sign-off before use. The full template is below, in the Artifact section — generated client-side, no server round-trip.

Artifact: vv-plan-template.md

Generated client-side; no server round-trip, no account required.

# Verification and Validation (V&V) Plan Template (v1.0.0)

Engineering reference template only. Not an approved plan until reviewed and
signed under your own quality system.

## 1. Scope
- Software item(s) covered:
- Safety classification (A/B/C) and rationale:
- Applicable standards (e.g. IEC 62304, ISO 14971):

## 2. Verification activities
- [ ] Unit implementation and verification (per unit, Class B/C)
- [ ] Integration testing (interfaces per architecture)
- [ ] System testing (against software requirements)
- [ ] Code review / static analysis records

## 3. Validation activities
- [ ] User needs analysis
- [ ] Intended-use / use-environment definition
- [ ] Validation test protocol (against user needs, not just requirements)
- [ ] Human factors / usability evidence, where applicable

## 4. Traceability
- Reference: the Requirements-to-Test Traceability Matrix for this item
  (see /resources/standards/requirements-test-traceability)

## 5. Risk-control verification
- Each risk control from the ISO 14971 file has a corresponding verification
  record confirming it is implemented and effective.

## 6. Acceptance criteria
- Explicit pass/fail thresholds per activity, agreed before execution begins.

## 7. Roles and sign-off
- Author:
- Technical reviewer:
- Quality approval:
- Date:

Download vv-plan-template.md

Provenance & review state

Last reviewed
Sources
  • IEC 62304:2006+AMD1:2015 — International Electrotechnical Commission
  • ISO 14971:2019 — International Organization for Standardization
Ingested from

Sign in or sign up

Enter your work email to receive a temporary sign-in link.

By continuing, you agree to our Terms of Service and Privacy Policy.